Construction of Goat Pen Has Begun

Dave worked on digging holes for the posts in the barn for the goat pen.  We have about 1-1/2 months to get the pen built, stone brought in, dumped and spread for the base flooring and then the fence built outside the barn before bringing the goats to the farm.  A lot of work ahead of us, but we are optimistic that it will get done in time!